不锈钢雕塑制作流程
一、内骨架的制作
The making of internal skeleton
1、根据雕塑模型按比例核算到所需高度雕塑内骨架的规格采用12#、10#、6.3#槽钢和76mm*3mm,50mm*3mm,32mm*2.75mm 的管材,5*5角铁从底往上,由粗变细,由密而疏焊成方笼。
1, according to the sculpture model according to the proportion of accounting to the required height of the sculpture within the framework of the specifications by 12#, 10#, 50mm*3mm, 76mm*3mm and 6.3# channel, 32mm*2.75mm pipe, 5*5 angle from the bottom up, from coarse to fine, dense and sparse welded by square cage.
2、焊接前除检查切口平整度外对管壁厚度大于或等于4㎜的管子应对管端加工V型坡口,管子坡口应按规定留有坡口间隙。所有承重骨架采用双面满焊接,整体骨架完成后,用防锈漆满途三遍。
2, in addition to the inspection before welding flat cut the pipe wall thickness of not greater than or equal to 4 mm with the pipe pipe end machining V groove should be required to leave the pipe beveling groove gap. All load-bearing skeletons are double sided and full welding. After the whole skeleton is completed, three times with antirust paint.
1、 主支架设计
1. Design of main support
(1)主支架承受的主要载荷。
(1) the main load of the main support.
1)主支架、副支架、铜像壁板及其他附件的重量。
1) the weight of the main support, the support, the bronze wall panel and the other accessories.
2) 稳态风载。在选定风速下一般考虑正面、侧面、背面、等四个方面作用在雕像身上的各方向风力。为提高结构安全,对统计出的实际重量,风速还得加一个放大系楼再用于主,副支架的设计。放大系数的大小每座雕塑都不尽相同,因各地的风速,温差,雕像自身结构物点等有所不同,前两者要从当地多年的统计选定,后者则要从雕像身高度与底面直径之比值来考虑,风载大小可根据风速进行计算,再用模型风洞试验测点数据,验证后确定。
2) steady state wind load. In the selected wind speeds generally consider the front, side and back, four aspects such as the body of the wind direction in the statue. In order to improve the safety of the structure, to the actual weight of the statistics, the wind speed must be added to a magnifying system building to be used for the design of the main and secondary supports. The size of the amplification coefficient of each sculpture are not the same, because of local wind speed, temperature, the statue itself structure point is different, the former two are selected from the local statistics for many years, the latter from the height of the statue and the bottom surface diameter ratio considering wind load size can be calculated according to the wind speed, and then model wind tunnel test data, after verification confirmed.
(2)主支架的外形及尺寸
(2) the shape and size of the main support
主支架的外廓形状和尺寸的设计,用1:5中样模型来测取从底平面开始取垂直
The design of the main frame outline shape and size, to test the start from the bottom plane of the vertical 1:5 like model
Z轴的横截面与雕塑外廓交线的一线点量取其平面坐标值。取点数的多少,应以能准确绘制出此截面上一圈外廓形状 的曲线为准。测得各点的坐标值乘5以后就得到了(1:1)足尺像的平面坐标值。各横截面之间在Z轴上的间距为0.5-(1:1值),逐层向上测量,就得了整座雕塑外形的空间坐标。再使主架外形与雕塑外形相似,流出两者间0.5-1.0m的间隙,这样就确定了主架的外形和尺寸后。
The first point amount of the Z axis of the cross section and intersection of the sculpture contour plane coordinate value. How many points should be taken, can accurately draw the cross section of a circle contour curve is. The measured coordinates of each point is multiplied by 5 after they got (1:1) as the plane coordinate full-scale value. The distance between the cross sections is 0.5- (1:1) on the Z axis, and the spatial coordinates of the whole sculpture are measured up by layer by layer. Then the shape of the main frame and the shape of the sculpture are similar, and the gap between the two 0.5-1.0m is efflux, so that the shape and size of the main frame are determined.
(3)主支架的形式
(3) the form of the main support
型钢焊接主架利用槽钢、角钢等型材焊接连成主支架。它有很好的刚度、强度,制作,安装比较主便。大多数的几何图形状作准确的难度大,在安装过程中往往会出现主架与铜壁板间有碰撞现象。而雕塑的铜壁板的外形不允许变动,只能修改主支架。
The main frame of the steel welding by channel angle etc. the main bracket into the welding section. It has a good stiffness, strength, production, installation and comparison of the main. Most geometric figures are very difficult to make, and there are often collisions between the main frame and the cupric wall during the installation process. The shape of the sculptured copper panel is not allowed to change, and the main support can only be modified.